![](https://720modular.ca/wp-content/uploads/2023/08/Screenshot-2024-03-18-at-4.25.04 PM.png)
Project Details
PRE-CONSTRUCTION: February, 2024
Size: Two Six Storey Buildings– 145,000 sf
Configuration: 82 Studio and One-Bedroom units, plus 64 One, Two, Three, and Four-Bedroom Units
Project Duration: 16 months
146 UNITS, 2 APARTMENT BUILDINGS
This project is underway in Phase 1 Pre-Construction. Our Design team, including our experienced modular Architect and suite of engineers, is busy working in collaboration with our local General Contractor.
We’re excited to Design-Build our largest project to date in the Maritimes.